Message ID: MC1079708 (Updated)
We are announcing the ability to edit transaction dates and exchange rates for per diem expenses to improve flexibility and accuracy in expense reporting, in Dynamics 365 Project Operations. This feature will reach general availability in September 2025. A follow-up message will be published at that time to confirm availability.
How does this affect me?
This capability will enable users to:
- Manually edit the transaction date for per diem expenses.
- Manually update the exchange rate to be used for currency conversion.
The modified information will be utilized in subsequent expense-related calculations and postings.
Currently, the expense management system does not allow for editing transaction dates and exchange rates. This limitation may lead to compliance concerns for organizations, particularly when specific regulatory requirements for expense conversions are not met. By addressing this gap, organizations can ensure accurate expense reporting, reduce compliance risks, and enhance the overall integrity of the expense management process.
What action do I need to take?
This message is for awareness and no action is required.
Source: Microsoft
<<< [MC1079708] Archive
Tooltip: View earlier revisions of this post
Latest Posts
- Microsoft Exchange Online: Dynamic distribution groups will populate membership faster on creation and modification [MC1294524]
![Microsoft Exchange Online: Dynamic distribution groups will populate membership faster on creation and modification [MC1294524] 2 pexels weekendplayer 93820](data:image/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==)
- Gemma 4 models are now available in Amazon SageMaker JumpStart

- Paraphrase-multilingual-MiniLM-L12-v2, Table Transformer Detection, and Bielik-11B-v3.0-Instruct are now available in Amazon SageMaker JumpStart

- Amazon DocumentDB (with MongoDB compatibility) is Now Available in the Canada West (Calgary) Region

![Dynamics 365 Project Operations - Edit per diem transaction date, exchange rate in expense management [MC1079708] 1 Dynamics 365 Project Operations – Edit per diem transaction date, exchange rate in expense management [MC1079708]](https://mwpro.co.uk/wp-content/uploads/2024/08/pexels-wildlittlethingsphoto-4402093-1024x683.webp)
![Microsoft Exchange Online: Dynamic distribution groups will populate membership faster on creation and modification [MC1294524] 2 pexels weekendplayer 93820](https://mwpro.co.uk/wp-content/uploads/2024/08/pexels-weekendplayer-93820-150x150.webp)



![Dynamics 365 Project Operations - Enable number sequences in expense management [MC1079742] 7 Dynamics 365 Project Operations – Enable number sequences in expense management [MC1079742]](https://mwpro.co.uk/wp-content/uploads/2024/08/pexels-googledeepmind-17485706-150x150.webp)