We are announcing the ability to adjust or reverse project timesheets in Dynamics 365 Project Operations. This feature will be made available for public preview on March 13, 2026.
How does this affect me?
This feature gives users insights into potential pricing concerns and the ability to enable a streamlined experience to correct intercompany timesheets. These corrections result in a full reversal and the ability to repost timesheets with the required change or updated pricing.
If you’re using Project Operations for Manufacturing, you will be able to enable the Enable posted intercompany project transactions correction feature to gain access to the following functionality:
- A new form that shows both incoming and outgoing intercompany timesheets.
- An indicator to alert when any prices are set to zero.
- An indicator to alert when the posted pricing is different than the configuration of date effective pricing.
- The ability for project managers to create corrections without being configured as a delegate.
- Increased traceability into the source of the transaction on the intercompany vendor invoice line.
This message is for awareness, and no action is required.
Source: Microsoft
Latest Posts
- Amazon OpenSearch Service optimised engine now publishes data to Amazon S3 Tables

- Amazon Timestream for InfluxDB 3 now supports heterogeneous clusters

- Amazon CloudWatch announces basic OpenTelemetry enrichment at no additional cost

- Amazon Neptune introduces Neptune Graph Sessions, smaller graphs designed for agents that scale to zero and resume automatically






